Choose a clear nameplate photo to prepopulate the equipment fields.
Equipment identity
Capture the tag first.
Everything collected next inherits this confirmed equipment identity.
Pump and component confirmation
Start with the whole pump.
Keep the equipment identity, manufacturer references, and component evidence together. AI findings remain review-required.
Primary equipment view
Main pump picture
Picture analysis
Upload component pictures once. ARIA archives and analyzes each image separately, then presents the visible component candidates for your decision.
No component pictures have been uploaded for this work order.
Human component decision
Confirm detected components
Component disassembly · guided evidence
Remove each component and complete its evidence.
Follow the teardown sequence. Every component ID, required view, measurement, and observation stays linked to the job and parent assembly.
- 1Remove componentWork one part at a time
- 2Confirm component IDLinked to job and parent assembly
- 3Follow inspection recipeUse the required evidence plan
- 4Capture required viewsOverall view and damage close-ups
- 5Record observationsMeasurements and voice notes
Evidence-grounded draft
AI drafts; the evidence stays visible.
Only human-confirmed identity and accepted evidence enter the submitted inspection record.
Submit evidence to create an assessment
- Observation
- No draft has been generated.
- Proposed disposition
- Needs review
- Limitations
- AI output remains advisory.
Preliminary component disposition table
Every visible component is listed once. Photo-only conclusions remain conditional until the required inspection is complete.
No assessment findings drafted.
Technical handoff preview
Executive summary
Generate the advisory assessment to preview the report narrative.
Inspection scope
Not drafted.
Repair strategy
Not drafted.
Overall pump condition
Not drafted.
Likely replacement kit
- Not drafted.
Immediate replacement
- Not drafted.
Further inspection and analysis required
- Not drafted.
Reusable after inspection
- Not drafted.
Critical return-to-service risks
- Not drafted.
Verification plan
- Not drafted.
Risks and limitations
- Not drafted.
Assessment boundary
This is a preliminary visual assessment, not a final release-to-service decision.
Technical authority
Review the draft against its sources.
Your decision—not the model output—becomes the authorized assessment.
Preliminary component disposition table
Open an assessment to review its findings.
Report narrative to be published
Executive summary
Open an assessment to see its report narrative.
Inspection scope
Not drafted.
Repair strategy
Not drafted.
Overall pump condition
Not drafted.
Likely replacement kit
- Not drafted.
Immediate replacement
- Not drafted.
Further inspection and analysis required
- Not drafted.
Reusable after inspection
- Not drafted.
Critical return-to-service risks
- Not drafted.
Verification plan
- Not drafted.
Risks and limitations
- Not drafted.
Assessment boundary
This is a preliminary visual assessment, not a final release-to-service decision.
Uploaded source evidence
Each item below is loaded from the exact immutable S3 object version cited by the submitted assessment evidence. Checksums and job references are revalidated before display.
Open an assessment to see its uploaded evidence.
Versioned assessment report
The approved record is ready.
Publication makes the assessment estimating-ready. It does not release a customer quote.
Assessment report
- Equipment identification
- DCIA stage summary
- Component findings and dispositions
- Recommended work
- Assumptions and exclusions
- Approval and provenance
- Numbered photo appendix
The approved AI-assisted narrative, findings, and exact evidence versions are rendered to PDF only after publication.
Organization and Shop administration
Users, work orders, and controls.
Manage only the Organization and Shop boundaries assigned to your account. Assessment decisions remain evidence-validated; quote release remains outside ARIA.
Open an admin feature to load current shop data.
Organization onboarding
Organization → Shops
Operational Shops and Shop Admins
Organization Admins can list every eligible managed user and assign any of them as the Shop Admin for an active Shop. Users not yet assigned join this Organization through that audited assignment. Users belonging to another Organization remain unavailable. Shop IDs remain immutable.
Open Organization onboarding to load Shops and eligible Shop Admin users.
Users, work orders, and controls
Manage work orders for this Shop
Assigned projects / work orders
No projects assigned.
Identity administration
Manage users and group permissions
Managed users in the selected Shop
Organization Admins can switch Shops to manage each local roster. Operational role changes take effect after the user signs out and signs in again. Shop Admin assignment remains in Organization & Shops. Disable an account before permanent deletion; retained inspection and audit records are not removed.
Open Users & Groups to load the selected Shop directory.
Usage charts
Workflow volume
Adoption & usage
Observed participation
Activity represents the retained shop audit record, not employee monitoring or cross-shop analytics.
Admin activity log
Recent immutable actions
| Time | Actor | Role | Action | Subject |
|---|---|---|---|---|
| No activity loaded. | ||||
No activity page loaded.
Value realization
Pilot outcomes
— completed reports
— submitted inspections
Approved baseline data is required.
AI settings